Education & Medical
Refurbishment of Hospital Dayroom
The project consisted of the removal of the existing wash hand basins and replaced with HTM64 compliant basin and taps with new duct panels to multiple consultant and nurses rooms. Continue reading
Refurbishment of Hospital Reception
This project consisted of the alterations and refurbishment of the existing hospital main reception, including the removal of existing walls, replacement of the suspended ceiling systems, Continue reading
New Science Laboratories
The project for Springwood High School in King’s Lynn consisted of the construction of new science laboratories using a traditional brick and block cavity external wall construction on strip foundations, with a block and beam first floor and mineral felt pitched roof. Continue reading
Replacement of Swimming Pool Enclosure
The project consisted of removing the old swimming pool building and constructing a new part brick/block construction and part steel structure with insulated panels. Internally, there were Continue reading
Alterations & Extension to Local School
The works consisted of construction of two single storey extensions in traditional construction to form a darkroom & music room classrooms and realigning of the existing asphalt rear access road to accommodate the new music Continue reading






