Education & Medical

Refurbishment of Hospital Reception

This project consisted of the alterations and refurbishment of the existing hospital main reception, including the removal of existing walls, replacement of the suspended ceiling systems, Continue reading

New Science Laboratories

The project for Springwood High School in King’s Lynn consisted of the construction of new science laboratories using a traditional brick and block cavity external wall construction on strip foundations, with a block and beam first floor and mineral felt pitched roof. Continue reading

Replacement of Swimming Pool Enclosure

The project consisted of removing the old swimming pool building and constructing a new part brick/block construction and part steel structure with insulated panels. Internally, there were Continue reading

Alterations & Extension to Local School

The works consisted of construction of two single storey extensions in traditional construction to form a darkroom & music room classrooms and realigning of the existing asphalt rear access road to accommodate the new music Continue reading

Classroom Extension to Local School

The works consisted of the extension to the existing school to form an additional classroom using traditional cavity wall construction with a flat Bauder roofing system. With alterations internally Continue reading